UBA undertook to upgrade all of its IT infrastructure so as to mark its postion as a leader in its sector. Part of this revamp was to upgrade its back up power for both its production servers as well as its operational servers and computers. HDV Tech designed, and project managed the implementation of this massive project.

The result was new power back up infrastucture which has an icrease in capacity of over 200% and an increase in autonumy of about 600%

HDV Tech was engaged by FCMB to design a more robust power back up system for their new proposed data centre and main regional offices.

HDV Tech was engaged by GTB to perform a gap analysis of their newly completed Data centre. This was done using TIA 942(International Standards for Data Centres)as the benchmark.

 

Sahara Energy required back up power for their IT infrastructure at several locations. HDV provided this and it has lead to increased uptimes, higher productivity, and reduced data loss.

 